A stretch of Highway 78 in Keokuk County near Richland has reopened after a bridge replacement project that closed the road for several months.
The bridge reopened on Monday, November 16th, as the closure had been in place since early June, shutting down a roughly three-mile stretch of road west of Richland to County Road V63 while crews replaced the bridge. The project had originally been expected to wrap up by September 15th.
During the closure, drivers were directed on a detour through the area, routing westbound Highway 78 traffic south on Highway 1, west on 120th Street into Packwood, and north on Church Street back to Highway 78.















